Solvay SFI Conference
Date
16.10.2013 to 17.10.2013
Location
The Egg, Brussels
Client
DDMC
Team

Production Manager ASP

Tom Van den Burg

 

Project Manager DDMC

Frank Anthierens

Based on the creative input of DDMC, ASP engineered and installed the audiovisual setup for this conference. The presentations were projected onto 16:9 front projections screens with 2 W8 Barco projectors. In order to increase the visual impact of the set we used a transparent backdrop with vertical LED strips to enhance the depth effect. The end result was a clean and classy stage area.