UCB High Impact Event
Date
10.09.2014 to 12.09.2014
Location
Tour & Taxis, Brussels
Client
DDMC
Team

Production Manager ASP:

Christophe van Schoorisse

 

Technical Engineering:

Maarten Pitteurs

 

Project Manager DDMC:

Nathalie Rasschaert & Stefan Ponet

Commissioned by DDMC, ASP took care of the full techncial production and engineering of this 3-day event.

Based on the creative input of DDMC we ensured a flawless execution of their scenographic design.

Event details:

Day 1: UCB's CEO, Roch Doliveux, stepped down on 31 December 2014 after successfully leading UCB for the last 10 years. UCB’s Board of Directors granted him the titles of Honorary Member of the Board and Honorary Chairman of the Executive Committee.

Day 2 & 3: International High Impact Meeting

 

Facts & Figures:

4 x retro projection surfaces of 10m x 5,6m

4 x Barco FLM HDX W8 (18.000lm)

4 x Barco Folsom Encore Processor

Multi cam set

95 moving heads

35rm Cameleon LED bar

360° setup with tiered seating and build-in Layher stage and catwalk

160rm of draping

125rm of pipe & drape